AV¾ãÀÖ²¿â€™s Chemistry Building and the Chemical Storage Facility will resume normal operations at noon today (July 27).
Sprinkler systems are now fully operational, allowing for a return to business-as-normal.
The Macdonald Building and Chase Building – excluding the basement, which remains closed – also resume normal operations, effective at noon.
In the LSC, the 8th floor of the LSC biology tower is still closed. The rest of the building is operating as normal.