Central Heating Plant
43 River Road
泭
In 1988 the central heating plant was renovated to include a wood chip boiler and chip storage bin.
Amenities
Wireless | No |
---|---|
Study Space | No |
Lounge Area | No |
Computer Access | No |
Food Services |
No |
泭
43 River Road
泭
In 1988 the central heating plant was renovated to include a wood chip boiler and chip storage bin.
Wireless | No |
---|---|
Study Space | No |
Lounge Area | No |
Computer Access | No |
Food Services |
No |
泭